Installation guides
I/A treatment with new gravity leaching
An advanced treatment unit reduces nitrogen before treated water flows to a newly installed gravity leaching structure.
When it makes sense
Discuss this option where existing disposal cannot be reused and the surveyed elevations and soils support gravity drainage.
What to budget
$28,313.06 was one vendor’s base estimate for an Orenco AX-20 in Suffolk’s November 2025 one- to four-bedroom table. Tax, engineering and design are extra. Ask for permit fees, site extras, restoration and ongoing maintenance as separate lines. This is a complete alternative to the other two scenarios. Four Seasons quotes your property individually.
How long the work takes
Quogue’s homeowner guide describes typical installation in up to two days. Allow separate time for design, approvals, grant review if applicable, inspection and restoration. Confirm the expected hours without plumbing before work starts.
What to ask at the inspection
Where will the new leaching structure sit, what will happen to the old one and what will the yard look like afterward?