# Stormwater pooling & damage assessment — Planning Guide

Planning guidance for stormwater pooling & damage assessment. Confirm availability and the qualified contractor required for your property.

Canonical: https://four-seasons-cesspool.vercel.app/services/stormwater-damage-assessment

Property planning
Stormwater pooling & damage assessment planning
Understand the options before choosing a contractor. This topic is an educational resource; Four Seasons does not advertise every specialized service described here.
Confirm the right team for the work
Four Seasons publishes cesspool, septic, drain cleaning, dry well and emergency services. For this specialized project, confirm whether the office can help and which licensed or certified professional is required. This page is not an offer to perform an unverified trade.
Ask about my project 
Record the incident from a safe place
Give the rainfall timing, first entry point and any exterior pooling. Keep people away from suspected sewage, unstable ground or water near electrical equipment.
Separate immediate damage from the cause
Drainage assessment, material drying, cleanup, structural evaluation and repairs can involve different trades. Ask for a written scope for the part under review.
If an onsite system was flooded
Tell the septic provider about saturated ground before requesting a pump-out. EPA advises against pumping a tank while its drainfield remains flooded or saturated.
Explore published Four Seasons services

## References

- [New York State stormwater design manual](https://extapps.dec.ny.gov/fs/docs/pdf/stormwaterdesignmanual.pdf)
- [EPA guidance for flooded septic systems](https://www.epa.gov/ground-water-and-drinking-water/septic-systems-what-do-after-flood)
- [EPA guidance on septic system malfunctions](https://www.epa.gov/septic/resolving-septic-system-malfunctions)
